Design, Supply & Installation of Material Handling Systems

Great Link Engineering Limited responsible of mechanical installation for:

 ~2,500 meter of belt conveyor

 ~2,100 m2 of caster desk

 ~1,100 m of sorter

 ~700 m of pneumatic pipe line

The peak of total labors on site will be ~ 130 ppls

Site area ~ 5,600 m2 for each floor with total three level of work area

Other Services