Design, Supply & Installation of Material Handling Systems
Great Link Engineering Limited responsible of mechanical installation for:
~2,500 meter of belt conveyor
~2,100 m2 of caster desk
~1,100 m of sorter
~700 m of pneumatic pipe line
The peak of total labors on site will be ~ 130 ppls
Site area ~ 5,600 m2 for each floor with total three level of work area
Featured Projects
The current query has no posts. Please make sure you have published items matching your query.